I'm afraid not, as it would still require a data merge.
Ah I think I was not very clear on my requirement. I was looking at porting project level, not entire clearml data over. Is it possible instead?
OddShrimp85 , Hi 🙂
I'm afraid that the only way to load contents of setup A into setup B is to perform a data merge.
This process basically requires merging the databases (mongodb, elasticsearch, files etc.). I think it's something that can be done in the paid version as a service but not in the open one.