Unanswered
Hi All,
Is It Possible To Control The Number Of Steps Of The Pipeline During Run Time.
Eg. If User Wants #N Parallel Steps In The Pipeline
yes, I'll better explain :
I have a task (a script created as a task), that can execute with different configurations
I want #n instances of the task to run with #n different configs
hence my pipeline can get a list of #n configs
and based on 'n', I'd like to have dynamic 'n' steps in the pipeline
183 Views
0
Answers
one year ago
one year ago